Left Shift Arm Build

Step 1

  • Cut 4"(100mm) off of the 340mm square tube.
    • Left over 240mm tube is used in step 9.

Step 2

  • Take note of the Power wire ends, Female pins are on servo side of tube.

 

17. Front Universal A

Step 3

  • Fit piece 17 flush to the end of square tube, and place servo as shown.

5. Pin Mount A

6. Pin Mount B

11. Tail Pin Left

Step 4

  • Assemble 5,6 and 11.
  • Washer is on the head side of the bolt this time. Place through piece 5 and 6.

 

Step 5

 

 

10. Motor Mount X2

Step 6

  • The horn of 11 is facing up.
  • Bolt motor with washers on the nut side.
  • Tuck wiring connections in to aluminum tube.

Step 8

  • Wrap power and servo wires through center hole of piece 17.
  • Connect 18" servo extention wire and 300mm power wires together.

Step 9

  • Slip 240mm square aluminum tube over wires and seat into piece 17.
  • Washers on head side of bolt, place bolts down through piece 17.
  • See step 11 for position of bolts.
  • Have a zip tie include wrapped around wire.

Large zip ties     

Step 11

  • Use two zip ties through pieces 5 and 6.
  • Three zip ties through 16 and 17.

This is the TERMS OF USE  for the pieces designed and pictures associated with dragonflyRC.com

Everything associated with dragonflyRC.com can be used freely but, under Creative Commons please make sure a link references dragonflyRC.com, thanks!